![]() |
|||||||||||||
|
National Express East Anglia |
![]() |
|
|---|---|
| Franchise(s): | Greater Anglia 1 April 2004 - 31 March 2011 (optionally 31 March 2014) |
| Main region(s): | East of England |
| Other region(s): | London |
| Fleet size: | 267 |
| Stations called at: | 167 |
| National Rail abbreviation: | LE |
| Parent company: | National Express Group |
| Web site: | www.nationalexpresseastanglia.com |
National Express East Anglia is a train operating company and brand name of London Eastern Railway Ltd in the United Kingdom. It is part of the National Express Group and was branded as ‘one’ from 1 April 2004 to 26 February 2008.1 It provides local, suburban and express services from Liverpool Street station in the City of London to destinations in the railway franchise known as the Greater Anglia network, stretching from north and east Greater London to Essex, Hertfordshire, Cambridgeshire, Suffolk and Norfolk in East Anglia.
Contents |
The franchise began on 1 April 2004 and is due to run until 31 March 2011. It combined the services previously operated by Anglia Railways, First Great Eastern and the West Anglia (WA) division of WAGN. The large franchise was created in order to improve efficiency and reliability as part of a move to reduce the number of train operating companies providing services from a single London terminal. As a result of the new franchise, the number of operators on the Great Eastern Main Line was reduced, with the company operating most services on the line.2
The area names from the former franchises were initially retained by the new franchise. However, all services other than Stansted Express were later branded simply ‘one’, reflecting the union of the three smaller franchises into one single franchise. This led to passenger confusion as they were unable to establish for example whether the announcer was saying the 07:20 "one" service would be delayed, or the 07:21 service. On 12 November 2007 it was announced that, as part of a company-wide re-branding exercise, National Express would change the name of the company to National Express East Anglia on 27 February 2008.1 On 11 December 2007 the first Class 90 locomotive to have been re-liveried was rolled out of the Crown Point depot at Norwich and was pictured in service the next day.3
In addition to its domestic services the company is also a partner, with Stena Line and Nederlandse Spoorwegen, in the Dutchflyer service. All the London services use Liverpool Street as their terminus . This station is visited by 123 million people a year.4
The company operates a fleet of Class 153, 156 and 170 DMUs for the local lines, with Class 315, 317, 321 and 360 EMUs for the mainline commuter services, and Class 90 locomotives with Mark 3 coaching stock for the intercity services.
Much of the rolling stock is in need of modernisation; class 150s have been replaced by 153s and 156s from Central Trains. The Class 170s are used predominantly on longer services, as they have slower acceleration than the Class 153 and 156 stock, meaning they cannot stick to the timetables of the many local lines.
As of July 2008, the Class 360s are being debranded, and are wearing a lilac livery with white doors. The 'Great Eastern' vinyls have been taken off. The Class 315, Class 317 (those in the ‘one’ livery) and Mark 3 units are also being debranded - ‘one’ logos have been removed, and the distinctive "rainbow" car ends painted over with the same blue as the rest of the body, and more recently have an interim National Express East Anglia branding on, the same style as used on former GNER Mk3s and Mk4s. Class 321s and Class 360s are also receiving the interim National East Anglia branding.
| Class | Image | Type | Top speed | Number | Routes operated | Built | |
|---|---|---|---|---|---|---|---|
| mph | km/h | ||||||
| Class 47 | diesel locomotive | 100 | 160 | Hired from Cotswold Rail | Train Rescue Great Yarmouth/Lowestoft- Norwich/London Liverpool Street (Summer Only) |
1963-1968 | |
| Class 90 | electric locomotive | 110† | 177† | 15 | Great Eastern Main Line London to Norwich | 1987 - 1990 | |
| Class 153 Super Sprinter | diesel multiple unit | 75 | 120 | 5 | Ipswich-Cambridge, Ipswich-Lowestoft/Felixstowe, Norwich-Great Yarmouth, Norwich-Lowestoft, Norwich-Sheringham, Sudbury-Marks Tey | 1987 - 1988 | |
| Class 156 Super Sprinter | diesel multiple unit | 75 | 120 | 9 | Ipswich-Cambridge, Ipswich-Lowestoft/Felixstowe, Norwich-Great Yarmouth, Norwich-Lowestoft, Norwich-Sheringham, Sudbury-Marks Tey | 1987 - 1989 | |
| Class 170 Turbostar | diesel multiple unit | 100 | 160 | 12 | Cambridge - Norwich and Liverpool Street - Peterborough/Lowestoft | 1999 - 2002 | |
| Class 315 | electric multiple unit | 75 | 120 | 61 | Liverpool Street - Shenfield/Southend/Southminster, Romford - Upminster, plus West Anglia Metro Services, and the Lea Valley | 1980 | |
| Class 317 | electric multiple unit | 100 | 160 | 60 | Stansted Express, Liverpool Street - Cambridge/Hertford East/Enfield Town, and Hertford East/Broxbourne - Stratford | 1981 - 1987 | |
| Class 321 | electric multiple unit | 100 | 160 | 77 | Mainline routes between Ipswich, Walton, Colchester, Braintree, Southminster, Southend, Witham and London, Colchester - Colchester Town, occasionally replacing 360's from London to Clacton/Harwich | 1986-88 | |
| Class 360 Desiro | electric multiple unit | 100 | 160 | 21 | Mainline routes between Ipswich, Clacton, Colchester, Harwich and London | 2002 - 2003 | |
| Mk3 Coach | Passenger Rolling stock | 125† | 200† | Over 100 | Great Eastern Main Line London to Norwich | 1975 - 1988 | |
| Driving Van Trailer | 110† | 177† | about 15 | Great Eastern Main Line London to Norwich | 1988 | ||
| Class | Image | Type | Built | Withdrawn |
|---|---|---|---|---|
| Class 86 | electric locomotive | 1963 - 1967 | 2005 | |
| Class 150 | Diesel multiple unit | 1983 - 1985 | 2004 | |
| Class 312 | electric multiple unit | 1966 - 1974 | 2004 | |
| Mark 2 coach | Passenger Rolling Stock | 1964 - 1975 | 2005 | |
| DBSO Control Car | 1979 | 2006 |
The Government's rolling stock plan will see the franchise take on ten additional Class 321s from London Midland. National Express will also secure the order of new build EMUs for its services in West Anglia to Stansted Airport, which will allow the release of a number of Class 317 units.5
Unlike many other operators in the London area, the company allows Oyster card pay as you go to be used on a limited number of its services and has announced roll-out plans for the remaining stations in Greater London.6
Infrastructure problems have caused problems with performance. According to Network Rail, the main problems have been track circuit failures, broken rails, track faults, points failures and overhead line equipment (OLE) failures.7 Network Rail, who are responsible for the infrastructure, intended to improve performance by work carried out during a planned closure of Liverpool Street station over Christmas and New Year 2007/8. This allowed much of the outer London overhead line equipment to be replaced by modern, self-tensioning lines.7 The work was carried out, but over-ran at short notice by some 24 hours, causing ridicule in the national press.8
Detailed figures (from the January edition of Modern Railways) of the miles covered per 5-minute delay for the year ending October 2007 showed that all of the operator's trains had improved over the previous year, with the exception of the Stansted Express trains. The greatest improvement (71%) was to the 'Intercity' (Norwich-Liverpool Street) locomotive-hauled trains. The 51% increase in reliability of the Turbostar trains (as used on services to Yarmouth and Peterborough, as well as the Cambridge-Norwich route) led to their being the most reliable new-generation diesel multiple units in the country. The most reliable trains in the fleet were the Class 360 Desiros (mainly Clacton - Liverpool Street), which achieved over 35,000 miles per 5-minute delay.
For the 12 months to 8 December 2007, the average punctuality for all services was 89.6%.9 Where delays occur the company has paid compensation to those who request it as part of their Passengers' Charter.10 The latest performance figures for the first quarter of the 2008-9 year released by the Office of Rail Regulation (ORR) were 91.4% for the public performance measure (PPM)11 for the quarter and 90.2% for the moving annual average (MAA)11 for the twelve months up to the end of the first quarter. Both of these measures are slightly down on the previous year.
| Preceded by Anglia Railways Anglia franchise |
Operator of Greater Anglia franchise 2004 - present |
Incumbent |
| Preceded by First Great Eastern Great Eastern franshise |
||
| Preceded by WAGN West Anglia Great Northern franchise |
|
|||||||||||||||||
|
|||||||||||||||||||||||